The Swift Package Index logo.Swift Package Index

Build Information

Failed to build FSCalendar, reference master (df53e7), with Swift 6.1 for Android on 28 May 2025 17:18:14 UTC.

Build Command

bash -c docker run --pull=always --rm -v "checkouts-4606859-3":/host -w "$PWD" registry.gitlab.com/finestructure/spi-images:android-6.1-latest swift build --swift-sdk aarch64-unknown-linux-android24 2>&1

Build Log

========================================
RunAll
========================================
Builder version: 4.63.1
Interrupt handler set up.
========================================
Checkout
========================================
Clone URL: https://github.com/WenchaoD/FSCalendar.git
Reference: master
Initialized empty Git repository in /host/spi-builder-workspace/.git/
hint: Using 'master' as the name for the initial branch. This default branch name
hint: is subject to change. To configure the initial branch name to use in all
hint: of your new repositories, which will suppress this warning, call:
hint:
hint: 	git config --global init.defaultBranch <name>
hint:
hint: Names commonly chosen instead of 'master' are 'main', 'trunk' and
hint: 'development'. The just-created branch can be renamed via this command:
hint:
hint: 	git branch -m <name>
From https://github.com/WenchaoD/FSCalendar
 * branch            master     -> FETCH_HEAD
 * [new branch]      master     -> origin/master
HEAD is now at df53e79 Merge pull request #1422 from wlxo0401/master
Cloned https://github.com/WenchaoD/FSCalendar.git
Revision (git rev-parse @):
df53e79c324ea5f9e3dcb03b35b2b324de901205
SUCCESS checkout https://github.com/WenchaoD/FSCalendar.git at master
========================================
Build
========================================
Selected platform:         android
Swift version:             6.1
Building package at path:  $PWD
https://github.com/WenchaoD/FSCalendar.git
https://github.com/WenchaoD/FSCalendar.git
WARNING: environment variable SUPPRESS_SWIFT_6_FLAGS is not set
{
  "dependencies" : [
  ],
  "manifest_display_name" : "FSCalendar",
  "name" : "FSCalendar",
  "path" : "/host/spi-builder-workspace",
  "platforms" : [
    {
      "name" : "ios",
      "version" : "9.0"
    }
  ],
  "products" : [
    {
      "name" : "FSCalendar",
      "targets" : [
        "FSCalendar"
      ],
      "type" : {
        "library" : [
          "automatic"
        ]
      }
    }
  ],
  "targets" : [
    {
      "c99name" : "FSCalendar",
      "module_type" : "ClangTarget",
      "name" : "FSCalendar",
      "path" : "FSCalendar",
      "product_memberships" : [
        "FSCalendar"
      ],
      "sources" : [
        "FSCalendar.m",
        "FSCalendarAppearance.m",
        "FSCalendarCalculator.m",
        "FSCalendarCell.m",
        "FSCalendarCollectionView.m",
        "FSCalendarCollectionViewLayout.m",
        "FSCalendarConstants.m",
        "FSCalendarDelegationFactory.m",
        "FSCalendarDelegationProxy.m",
        "FSCalendarExtensions.m",
        "FSCalendarHeaderView.m",
        "FSCalendarSeparatorDecorationView.m",
        "FSCalendarStickyHeader.m",
        "FSCalendarTransitionCoordinator.m",
        "FSCalendarWeekdayView.m"
      ],
      "type" : "library"
    }
  ],
  "tools_version" : "5.3"
}
Running build ...
bash -c docker run --pull=always --rm -v "checkouts-4606859-3":/host -w "$PWD" registry.gitlab.com/finestructure/spi-images:android-6.1-latest swift build --swift-sdk aarch64-unknown-linux-android24 -Xswiftc -Xfrontend -Xswiftc -stats-output-dir -Xswiftc -Xfrontend -Xswiftc .stats -Xswiftc -strict-concurrency=complete -Xswiftc -enable-upcoming-feature -Xswiftc StrictConcurrency -Xswiftc -enable-upcoming-feature -Xswiftc DisableOutwardActorInference -Xswiftc -enable-upcoming-feature -Xswiftc GlobalActorIsolatedTypesUsability -Xswiftc -enable-upcoming-feature -Xswiftc InferSendableFromCaptures 2>&1
android-6.1-latest: Pulling from finestructure/spi-images
Digest: sha256:fe1962677657b2408c217cb5cceb3c09bc1d91486e360cebbc6eee461a5945d8
Status: Image is up to date for registry.gitlab.com/finestructure/spi-images:android-6.1-latest
Building for debugging...
In file included from /host/spi-builder-workspace/FSCalendar/FSCalendarConstants.m:11:
/host/spi-builder-workspace/FSCalendar/FSCalendarConstants.h:11:9: fatal error: 'UIKit/UIKit.h' file not found
   11 | #import <UIKit/UIKit.h>
      |         ^~~~~~~~~~~~~~~
1 error generated.
[0/15] Compiling FSCalendar FSCalendarConstants.m
[0/15] Compiling FSCalendar FSCalendar.m
In file included from /host/spi-builder-workspace/FSCalendar/FSCalendarCell.m:9:
/host/spi-builder-workspace/FSCalendar/FSCalendarCell.h:9:9: fatal error: 'UIKit/UIKit.h' file not found
    9 | #import <UIKit/UIKit.h>
      |         ^~~~~~~~~~~~~~~
1 error generated.
[0/15] Compiling FSCalendar FSCalendarCell.m
In file included from /host/spi-builder-workspace/FSCalendar/FSCalendarAppearance.m:11:
In file included from /host/spi-builder-workspace/FSCalendar/FSCalendarAppearance.h:11:
/host/spi-builder-workspace/FSCalendar/FSCalendarConstants.h:11:9: fatal error: 'UIKit/UIKit.h' file not found
   11 | #import <UIKit/UIKit.h>
      |         ^~~~~~~~~~~~~~~
1 error generated.
[0/15] Compiling FSCalendar FSCalendarAppearance.m
In file included from /host/spi-builder-workspace/FSCalendar/FSCalendarCollectionView.m:11:
/host/spi-builder-workspace/FSCalendar/FSCalendarCollectionView.h:9:9: fatal error: 'UIKit/UIKit.h' file not found
    9 | #import <UIKit/UIKit.h>
      |         ^~~~~~~~~~~~~~~
[0/15] Compiling FSCalendar FSCalendarCollectionView.m
In file included from /host/spi-builder-workspace/FSCalendar/FSCalendarCalculator.m:9:
/host/spi-builder-workspace/FSCalendar/FSCalendar.h:18:9: fatal error: 'UIKit/UIKit.h' file not found
   18 | #import <UIKit/UIKit.h>
      |         ^~~~~~~~~~~~~~~
[0/15] Compiling FSCalendar FSCalendarCalculator.m
In file included from /host/spi-builder-workspace/FSCalendar/FSCalendarDelegationFactory.m:9:
/host/spi-builder-workspace/FSCalendar/FSCalendarDelegationFactory.h:9:9: fatal error: 'Foundation/Foundation.h' file not found
    9 | #import <Foundation/Foundation.h>
      |         ^~~~~~~~~~~~~~~~~~~~~~~~~
1 error generated.
[0/15] Compiling FSCalendar FSCalendarDelegationFactory.m
In file included from /host/spi-builder-workspace/FSCalendar/FSCalendarCollectionViewLayout.m:9:
/host/spi-builder-workspace/FSCalendar/FSCalendarCollectionViewLayout.h:9:9: fatal error: 'UIKit/UIKit.h' file not found
    9 | #import <UIKit/UIKit.h>
      |         ^~~~~~~~~~~~~~~
1 error generated.
[0/15] Compiling FSCalendar FSCalendarCollectionViewLayout.m
Running build ...
bash -c docker run --pull=always --rm -v "checkouts-4606859-3":/host -w "$PWD" registry.gitlab.com/finestructure/spi-images:android-6.1-latest swift build --swift-sdk aarch64-unknown-linux-android24 2>&1
android-6.1-latest: Pulling from finestructure/spi-images
Digest: sha256:fe1962677657b2408c217cb5cceb3c09bc1d91486e360cebbc6eee461a5945d8
Status: Image is up to date for registry.gitlab.com/finestructure/spi-images:android-6.1-latest
[0/1] Planning build
Building for debugging...
In file included from /host/spi-builder-workspace/FSCalendar/FSCalendarSeparatorDecorationView.m:9:
/host/spi-builder-workspace/FSCalendar/FSCalendarSeparatorDecorationView.h:9:9: fatal error: 'UIKit/UIKit.h' file not found
    9 | #import <UIKit/UIKit.h>
      |         ^~~~~~~~~~~~~~~
1 error generated.
[0/15] Compiling FSCalendar FSCalendarSeparatorDecorationView.m
In file included from /host/spi-builder-workspace/FSCalendar/FSCalendarWeekdayView.m:9:
/host/spi-builder-workspace/FSCalendar/FSCalendarWeekdayView.h:9:9: fatal error: 'UIKit/UIKit.h' file not found
    9 | #import <UIKit/UIKit.h>
      |         ^~~~~~~~~~~~~~~
1 error generated.
[0/15] Compiling FSCalendar FSCalendarWeekdayView.m
In file included from /host/spi-builder-workspace/FSCalendar/FSCalendarDelegationProxy.m:9:
/host/spi-builder-workspace/FSCalendar/FSCalendarDelegationProxy.h:14:9: fatal error: 'Foundation/Foundation.h' file not found
   14 | #import <Foundation/Foundation.h>
      |         ^~~~~~~~~~~~~~~~~~~~~~~~~
[0/15] Compiling FSCalendar FSCalendarDelegationProxy.m
In file included from /host/spi-builder-workspace/FSCalendar/FSCalendarStickyHeader.m:9:
/host/spi-builder-workspace/FSCalendar/FSCalendarStickyHeader.h:9:9: fatal error: 'UIKit/UIKit.h' file not found
    9 | #import <UIKit/UIKit.h>
      |         ^~~~~~~~~~~~~~~
[0/15] Compiling FSCalendar FSCalendarStickyHeader.m
In file included from /host/spi-builder-workspace/FSCalendar/FSCalendarExtensions.m:9:
/host/spi-builder-workspace/FSCalendar/FSCalendarExtensions.h:9:9: fatal error: 'UIKit/UIKit.h' file not found
    9 | #import <UIKit/UIKit.h>
      |         ^~~~~~~~~~~~~~~
1 error generated.
[0/15] Compiling FSCalendar FSCalendarExtensions.m
In file included from /host/spi-builder-workspace/FSCalendar/FSCalendarHeaderView.m:9:
/host/spi-builder-workspace/FSCalendar/FSCalendar.h:18:9: fatal error: 'UIKit/UIKit.h' file not found
   18 | #import <UIKit/UIKit.h>
      |         ^~~~~~~~~~~~~~~
[0/15] Compiling FSCalendar FSCalendarHeaderView.m
In file included from /host/spi-builder-workspace/FSCalendar/FSCalendarTransitionCoordinator.m:9:
In file included from /host/spi-builder-workspace/FSCalendar/FSCalendarTransitionCoordinator.h:9:
/host/spi-builder-workspace/FSCalendar/FSCalendar.h:18:9: fatal error: 'UIKit/UIKit.h' file not found
   18 | #import <UIKit/UIKit.h>
      |         ^~~~~~~~~~~~~~~
[0/15] Compiling FSCalendar FSCalendarTransitionCoordinator.m
[0/15] Compiling FSCalendar FSCalendarDelegationFactory.m
BUILD FAILURE 6.1 android